Arlington, they had moved the tank from its original location, but haven't finished the pad yet for its new location. (How many jobs do you get to move a tank on? Not many!)
dozer and tank.
I was onsite for the approach slab pours, but then got kicked off the job site for the sidewalk pours. The air was all wonky while I was onsite for the approach slab concrete. Same thing happened last year, whenever I came onsite during the pile driving operations, the pile driver would break down.
Pouring the second approach slab.
Stone work for the channel and floodplain.
Got to see the progress they were making on the Mendon Brook and Mendon Ravine. The ravine actually looks steeper to me now than it did in the winter when we hiked up it.
Brook and Ravine.
Excavator reinforcing the channel bottom.
Completed Ravine.